IAD Index of Academic Documents
  • Home Page
  • About
    • About Izmir Academy Association
    • About IAD Index
    • IAD Team
    • IAD Logos and Links
    • Policies
    • Contact
  • Submit A Journal
  • Submit A Conference
  • Submit Paper/Book
    • Submit a Preprint
    • Submit a Book
  • Contact
  • Süleyman Demirel Üniversitesi Fen Bilimleri Enstitüsü Dergisi
  • Volume:22 Issue:2
  • Optimization of Project Scheduling Activities in Dynamic CPM and PERT Networks Using Genetic Algorit...

Optimization of Project Scheduling Activities in Dynamic CPM and PERT Networks Using Genetic Algorithms

Authors : M Hanefi CALP, M Ali AKCAYOL
Pages : 615-627
View : 19 | Download : 11
Publication Date : 2018-08-15
Article Type : Research Paper
Abstract :Projects consist of interconnected dimensions such as objective, time, resource and environment. Use of these dimensions in a controlled way and their effective scheduling brings the project success. Project scheduling process includes defining project activities, and estimation of time and resources to be used for the activities. At this point, the project resource-scheduling problems have begun to attract more attention after Program Evaluation and Review Technique insert ignore into journalissuearticles values(PERT); and Critical Path Method insert ignore into journalissuearticles values(CPM); are developed one after the other. However, complexity and difficulty of CPM and PERT processes led to the use of these techniques through artificial intelligence methods such as Genetic Algorithm insert ignore into journalissuearticles values(GA);. In this study, an algorithm was proposed and developed, which determines critical path, critical activities and project completion duration by using GA, instead of CPM and PERT techniques used for network analysis within the scope of project management. The purpose of using GA was that these algorithms are an effective method for solution of complex optimization problems. Therefore, correct decisions can be made for implemented project activities by using obtained results. Thus, optimum results were obtained in a shorter time than the CPM and PERT techniques by using the model based on the dynamic algorithm. It is expected that this study will contribute to the performance field insert ignore into journalissuearticles values(time, speed, low error etc.); of other studies.
Keywords : Project management, CPM, PERT, Project scheduling, Genetic algorithm, Optimization

ORIGINAL ARTICLE URL
VIEW PAPER (PDF)

* There may have been changes in the journal, article,conference, book, preprint etc. informations. Therefore, it would be appropriate to follow the information on the official page of the source. The information here is shared for informational purposes. IAD is not responsible for incorrect or missing information.


Index of Academic Documents
İzmir Academy Association
CopyRight © 2023-2025