IAD Index of Academic Documents
  • Home Page
  • About
    • About Izmir Academy Association
    • About IAD Index
    • IAD Team
    • IAD Logos and Links
    • Policies
    • Contact
  • Submit A Journal
  • Submit A Conference
  • Submit Paper/Book
    • Submit a Preprint
    • Submit a Book
  • Contact
  • Gazi University Journal of Science
  • Volume:25 Issue:1
  • A New Crossover Operator for Single Machine Total Weighted Tardiness Problem with Sequence Dependent...

A New Crossover Operator for Single Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times

Authors : Gökhan KIRLIK, Zuhal KARTAL, Servet HASGUL
Pages : 127-136
View : 48 | Download : 8
Publication Date : 2012-01-24
Article Type : Other Papers
Abstract :The single machine total weighted tardiness problem with sequence dependent setup times is a challenging and heavily studied problem. This problem is NP-hard, so several heuristics have been proposed in the literature so far. One of them is the genetic algorithm. The genetic algorithm is both powerful solution technique and applicable to wide range of different problem types, although its performance is heavily parameter and operator dependent. It is seen in literature that the well-conducted and adapted genetic algorithm operators and parameters increase the solution quality. In this study, a new crossover operator is proposed for the single machine with sequence dependent setup times problem to minimize the total weighted tardiness. The proposed crossover operator improves the relative positions by using apparent tardiness cost with setups insert ignore into journalissuearticles values(ATCS); heuristic while preserving the absolute positions. These are the two main aspects of the permutation type crossover operators for scheduling problems. The performance of the proposed crossover operator is tested by comparing it with partially mapped crossover insert ignore into journalissuearticles values(PMX); in different test cases using benchmark instances from literature. It is shown that the proposed ATCS based crossover operator gives better results than PMX in all test problems. Key Words: Weighted tardiness scheduling, Sequence dependent setups, Genetic algorithm, Crossover operator    
Keywords : Key Words Weighted tardiness scheduling, Sequence dependent setups, Genetic algorithm, Crossover operator

ORIGINAL ARTICLE URL

* There may have been changes in the journal, article,conference, book, preprint etc. informations. Therefore, it would be appropriate to follow the information on the official page of the source. The information here is shared for informational purposes. IAD is not responsible for incorrect or missing information.


Index of Academic Documents
İzmir Academy Association
CopyRight © 2023-2026