- International Journal of Energy Applications and Technologies
- Volume:5 Issue:2
- Greenough River Solar Farm case study & validation initialization
Greenough River Solar Farm case study & validation initialization
Authors : Burak Omer SARACOGLU, Angus KİNG
Pages : 82-97
Doi:10.31593/ijeat.420701
View : 35 | Download : 8
Publication Date : 2018-10-20
Article Type : Research Paper
Abstract :Large Photovoltaic Solar Power Plants insert ignore into journalissuearticles values(LPVPPs); and Very Large Photovoltaic Solar Power Plants insert ignore into journalissuearticles values(VLPVPPs); may have rapid success in the revolutionary change of the national and international power grids to build a 100% renewable power Global Grid. The Australian continent has outstanding solar resource availability, enabling widespread utilization of solar power and power storage technologies insert ignore into journalissuearticles values(e.g. pumped hydroelectric, thermal, electrochemical);. Design and investment modeling of the renewable power grid is the success key for a 100% renewable power grid. The design and investment in LPVPPs and VLPVPPs should preferably be undertaken with the consideration of values such as environmental friendliness, fairness, openness to small private investors, reliability, and accountability. The design of LPVPPs and VLPVPPs should preferably be based on some small-scale PV power plants to help reduce the risks for large to very large investments. Hence, validation and verification efforts of operational PV power plants with different design software are very important for the solar industry. This research paper presents the first specific validation and verification study of the Greenough River Solar Farm insert ignore into journalissuearticles values(12,68 MWDC, 10,00 MWAC, the first planned expansion to 40,00 MWAC in 2019); near Geraldton in Western Australia with the PVWatts Version 5 model of the National Renewable Energy Laboratory insert ignore into journalissuearticles values(NREL); System Advisor Model insert ignore into journalissuearticles values(SAM); Version 2017.9.5. The National Aeronautics and Space Administration insert ignore into journalissuearticles values(NASA); Modern-Era Retrospective Analysis for Research and Applications Version 2 insert ignore into journalissuearticles values(MERRA-2); datasets are used as a weather data source in this study. Location and resource, system design data and information on the Greenough River Solar Farm in this study are presumptions based upon publicly available information without any confirmation of power plant owners and operators. The Greenough River Solar Farm NREL SAM software models` are run on 2 different personal computers insert ignore into journalissuearticles values(PCs); with internet connection for years 2013 to 2017. The results of 6 simple simulations are compared with actual generation data for 2013 through 2017 with some statistical performance measures of the global unique forecast accuracy metrics pool in the Global Grid Prediction Systems insert ignore into journalissuearticles values(G2PS);. The simulations average total time insert ignore into journalissuearticles values(milliseconds); are 64.1 and 77.9. The best model/actual accuracy measure is 101.9%. The minimum root mean square error insert ignore into journalissuearticles values(RMSE); is 254.142 MWh in 2013. The maximum RMSE is 414.931 MWh in 2014.Keywords : SAM, System Advisor Model, Greenough River Solar Farm, Very Large Photovoltaic Solar Power Plants, NASA MERRA 2, Australia
ORIGINAL ARTICLE URL