IAD Index of Academic Documents
  • Home Page
  • About
    • About Izmir Academy Association
    • About IAD Index
    • IAD Team
    • IAD Logos and Links
    • Policies
    • Contact
  • Submit A Journal
  • Submit A Conference
  • Submit Paper/Book
    • Submit a Preprint
    • Submit a Book
  • Contact
  • Bilişim Teknolojileri Dergisi
  • Volume:9 Issue:2
  • A Genetic Algorithm To Minimize Makespan and Number of Tardy Jobs In Parallel Machine Scheduling Pro...

A Genetic Algorithm To Minimize Makespan and Number of Tardy Jobs In Parallel Machine Scheduling Problems

Authors : Ural Gökay ÇİÇEKLİ
Pages : 147-0
View : 39 | Download : 12
Publication Date : 2016-05-25
Article Type : Other Papers
Abstract :This paper presents a genetic algorithm solution for parallel machine scheduling problems with a real factory case. Various genetic components and operators were examined to design a genetic algorithm for a parallel machine scheduling problem with an objective of minimizing makespan and the number of tardy jobs. A production schedule was optimized using a genetic algorithm and results were compared. The experimental results demonstrated that a genetic algorithm encoding method performed successfully to achieve a solution for parallel machine problems.
Keywords : Genetic algorithm, Parallel machine scheduling, tardy jobs

ORIGINAL ARTICLE URL

* There may have been changes in the journal, article,conference, book, preprint etc. informations. Therefore, it would be appropriate to follow the information on the official page of the source. The information here is shared for informational purposes. IAD is not responsible for incorrect or missing information.


Index of Academic Documents
İzmir Academy Association
CopyRight © 2023-2026