IAD Index of Academic Documents
  • Home Page
  • About
    • About Izmir Academy Association
    • About IAD Index
    • IAD Team
    • IAD Logos and Links
    • Policies
    • Contact
  • Submit A Journal
  • Submit A Conference
  • Submit Paper/Book
    • Submit a Preprint
    • Submit a Book
  • Contact
  • Nevşehir Bilim ve Teknoloji Dergisi
  • Volume:5 Issue:2
  • Total Completion Time Scheduling Problem with Temperature Considerations

Total Completion Time Scheduling Problem with Temperature Considerations

Authors : Mduran TOKSARI
Pages : 185-192
Doi:10.17100/nevbiltek.284741
View : 36 | Download : 13
Publication Date : 2016-12-31
Article Type : Other Papers
Abstract :The focus of this work is to analyze working environment temperature in single-machine scheduling problems. In classical scheduling problems, the processing times are considered usually without the effect of working environment temperature. However, in many real scheduling environments, working environment temperature may affect processing time due to the nature of work. In this paper, we present job processing times based on the working environment temperature for total completion time insert ignore into journalissuearticles values(square); problem. We derive solutions with polynomial-time for both objectives.
Keywords :

ORIGINAL ARTICLE URL

* There may have been changes in the journal, article,conference, book, preprint etc. informations. Therefore, it would be appropriate to follow the information on the official page of the source. The information here is shared for informational purposes. IAD is not responsible for incorrect or missing information.


Index of Academic Documents
İzmir Academy Association
CopyRight © 2023-2026