IAD Index of Academic Documents
  • Home Page
  • About
    • About Izmir Academy Association
    • About IAD Index
    • IAD Team
    • IAD Logos and Links
    • Policies
    • Contact
  • Submit A Journal
  • Submit A Conference
  • Submit Paper/Book
    • Submit a Preprint
    • Submit a Book
  • Contact
  • Gazi University Journal of Science
  • Volume:37 Issue:3
  • Event Sequence Based Fault Tree Analysis to Evaluate Minimal Combination of Event Sequences Leading ...

Event Sequence Based Fault Tree Analysis to Evaluate Minimal Combination of Event Sequences Leading to the Reactor Core Damage

Authors : Damianus Toersiwi Sony Tjahyani, Julwan Hendry Purba, Andi Sofrany Ekariansyah, Surip Widodo, Susyadi Susyadı, Ratih Luhuring Tyas
Pages : 1319-1339
Doi:10.35378/gujs.1313692
View : 108 | Download : 250
Publication Date : 2024-09-01
Article Type : Research Paper
Abstract :Probabilistic safety assessment has been widely used to evaluate nuclear power plant safety systems. It couples fault tree (FT) analysis and event tree (ET) analysis. The FT analysis is to develop failure scenarios, to quantify the failure probability, and to identify critical components. The ET analysis is to develop event sequences (ESs) leading to reactor core damage and quantify core damage frequency. Currently, there is no approach in probabilistic safety assessment that can be used to identify minimal combinations of safety system failures leading to reactor core damage. This study proposes an event sequence based fault tree analysis, which integrates the FT model with the ET model. The ET model is to identify the ESs leading to the reactor core damage. Meanwhile, the FT model is to identify minimal combinations of those ESs found in the ET model. The motivation of this study is how to identify critical safety systems in nuclear power plants to mitigate disturbances caused by a group of postulated initiating events to avoid core damage. To confirm the feasibility and the applicability of the proposed approach, the performance of the AP1000 passive core cooling system is evaluated. It is found that if an in-containment refueling water storage tank, an automatic depressurization system – full, an accumulator, a core make-up tank, and a passive residual heat removal work properly, the reactor core will remain intact. These results confirmed that the proposed approach could be applicable to identify minimal combinations of safety systems to keep the reactor core intact.
Keywords : Fault tree analysis, Event tree analysis, Event sequence, AP1000, Core cooling system

ORIGINAL ARTICLE URL
VIEW PAPER (PDF)

* There may have been changes in the journal, article,conference, book, preprint etc. informations. Therefore, it would be appropriate to follow the information on the official page of the source. The information here is shared for informational purposes. IAD is not responsible for incorrect or missing information.


Index of Academic Documents
İzmir Academy Association
CopyRight © 2023-2025